More progress on the viking longhouse - I have replaced the mdf roof supports with twigs from the garden. These were leftover from a prune of my birch trees. The twigs were dried in the microwave, then roughly cut to size. I trimmed off the bark as I figured it would just drop off anyway over time. I chose a random size and positioning along the sides of the building, but the front has slightly
Categories
Recent Posts
- Relictors Space Marine Chapter – Castraferrum Dreadnought #12 2024/08/31
- How I potentially ruined an expensive model! 2024/08/30
- Four Factions Battle for Supremacy: Warhammer 40k Tournament Results 2024/08/29
- To Do List 2024/25 2024/08/28
- Short Break – See you in September 2024/08/27